Thursday, November 19, 2015

Job could take awhile

Szentendre bike path work moves progresses slowly.
As mentioned in my previous post, I went ahead an contacted the Hungarian Road Company, Magyar Közút Zrt., about their recently started patch job on the bike path between Budapest and Szentendre. In my email to them, I explained that the work to date didn't look adequate. The path is 25 years old and in a terrible state of repair. I told them I've been cycling on it almost daily since 2002, and that I've busted many spokes, wheels and axles because of all the cracks and potholes on this path. It needs a complete resurfacing, not the sort of remedial patch job that's being done.

I sent that note on Friday (Nov. 13) and received a reply on Monday from Attila Tóth, Magyar Közút's supervising engineer for operations and maintenance. In essence, he explained that the Szentendre bike path does not belong to the Hungarian road network, but due to an "unfortunate administrative procedure," Magyar Közút was selected to maintain it. The company tried to hand it over to local governments -- by which he means, I assume, the municipalities of Szententre, Budakalász and Békásmegyer -- but none of them manned up. Magyar Közút doesn't have dedicated resources for bike path maintenance, so they're expending only minimal energy on the current job, and only as weather allows. They're employing inefficient technologies ("by hand" he said), as their modern road-making machines can't access the path.

This response doesn't offer any solace or recourse to the users of the path. Just a long explanation of why the situation is shitty and why it can't be anything other than shitty.

On the bright side, I noticed this morning that a Magyar Közút road crew was on the job once again. As promised, the work is agonisingly slow. Last Thursday, they managed to fix about 100 metres of path and if they do the same today, that'll be 200 metres. At this rate (100 metres per week), we can expect the entire 10 kilometre path to be patched up in 100 weeks. But of course, work will cease during winter and when Magyar Közút is busy with more pressing work (i.e., anything else). So even if they stick with it, the job could take several years.

For those who use this path, I'd urge you to contact Mr. Tóth and tell him why this job is important:
Tóth Attila
Üzemeltetési és fenntartási vezető mérnök
Magyar Közút Nonprofit Zrt.
E-mail: toth.attila@pest.kozut.hu
Webpage: www.kozut.hu
For the record, here's my email exchange with Mr. Tóth in Hungarian:

Tisztelt Magyar Közút Nonprofit Zrt!

Ma reggel kerékpárral mentem dolgozni a 11-es út melletti kerékpárúton Budapest és Szentendre között, ahol észrevettem, hogy a Magyar Közút munkásai már elvégeztek néhány javítást az út egy rövid, 100 méteres szakaszán.

Az iránt szeretnék érdeklődni, hogy mik a Magyar Közút tervei a kerékpárút javításával kapcsolatban? Az útvonal 10 kilométer hosszú, 25 éves, és a teljes hosszában nagyon leromlott állapotban van - úgy gondolom, hogy a kátyúzás nem fogja megoldani a problémát, egy teljesen új burkolatra lenne szükség.

2002 óta járok Szentendrére dolgozni és szinte minden nap ezen az úton kerékpározok. A repedések és úthibák miatt számos küllő, kerék és tengely ment már tönkre az én és kollégáim kerékpárján. Bízom benne, hogy a Magyar Közút olyan megoldást talál, ami hosszú távon is lehetővé teszi, hogy az emberek végre kényelmesen és biztonságosan tudjanak kerékpározni Budapest és Szentendre között.

Válaszukat előre is köszönöm!

Üdvözlettel,

Greg Spencer
_____________
Tisztelt Greg Spencer Úr!

Köszönjük megkeresését a 11. sz. (Budapest – Esztergom – Tát) másodrendű főút 13+236 – 16+952 km szelvények közötti szakaszán az országos közúttal párhuzamosan haladó kerékpárút burkolat állapotára vonatkozóan.

Tájékoztatjuk, hogy a kerékpárút nem része az országos közúthálózatának, így Társaságunk részére nincs elkülönített, előirányzott forrás ilyen osztályú létesítmények kezelési és üzemeltetési feladatainak ellátására. Ezen túlmenően az országos közúthálózattal kapcsolatos feladatok elvégzése mellett korlátozott kapacitása és eszköze marad Társaságunknak ezen, rendezetlen tulajdonviszonyú kerékpárút üzemeltetésére, ill. karbantartására.

Tárgyi ügyben az évek során több megkeresés, illetve bejelentés érkezett már Társaságunkhoz. Álláspontunk továbbra is az, hogy a tulajdonosi háttér rendezetlen és Társaságunk csak egy szerencsétlen ügymenet kapcsán került üzemeltetőként kijelölésre.

Ezen rendezetlen állapot okán kértük az érintett önkormányzatokat, hogy vegyék át kezelésbe az érintett kerékpárutat. Természetesen az ingatlan-nyilvántartás rendezésében partnerek vagyunk és ehhez a szükséges segítséget Társaságunk megadja.

Mindezeket figyelembe véve területileg illetékes szentendrei mérnökségünk feladattervi lehetőségei alapján, a burkolathibák javítását - az erre megfelelő célgép hiányában, korlátozott technológia alkalmazásával kézi erővel tudja elvégezni, mivel a meglévő eszközeink számára a kerékpárút megközelíthetetlen – az időjárás és kapacitás függvényében folyamatosan végzi.

Kérjük tájékoztatásunk szíves elfogadását.

Üdvözlettel

Tóth Attila
Üzemeltetési és fenntartási vezető mérnök
Magyar Közút Nonprofit Zrt.
Pest Megyei Igazgatóság
1134 Budapest, Váci út 45 D.

Friday, November 13, 2015

Szententre bike path being ... patched :-(

These are some of the patches done November 12, 2015 at northern end of Szentendre Bike Path. Work to date covers about 100 meters of the 10 kilometre path.
Looks like I got carried away. From the looks of the ongoing work on the Szentendre bike path, it's not being resurfaced, as I was led to believe, but rather getting a remedial patch job.

Actually, it's not clear what's going on. Yesterday, there was a work crew on the path at the Szentendre end. They told me they were just getting started on a repair of the entire length of the path -- from Szentendre to Budapest. But checking the progress this morning, there were nine patches over a short section of maybe 150 meters, and the work crew was nowhere to be seen. I don't know if this means they'll be back later to continue the work, or if they've already called it good. But even in the best case, it looks like I got way ahead of myself thinking they were doing a resurfacing. It's a patch job, the latest of several that have been done over the years. I'm planning to send a letter to the authority in charge, Magyar Közút Zrt., to clarify their plans.

In the meantime, I documented a few representative cracks and potholes to show just how dire the situation is. Sections of the path are so disintegrated that they're basically being reclaimed by nature. Like in photos of the Chernobyl Exclusion Zone.
This section is about halfway between Budapest and Szentendre just north of the Renault dealership.
Here, the edge of the path has broken off and is gradually sliding into
the ditch along Route 11.
Several years ago, some pavement milling was performed to smooth out some of the more egregious heaves and buckles on the path. Normally, milling is followed by resurfacing, but in this instance, they milled a few spots and disappeared. The result was awful. In some spots, the path had become even worse. Which is saying something.
This is a fun one for the adventurous cyclist. The recommended line of approach here is on the right, about 20 cm from the edge. You can't avoid a bump, but you can cut your losses. 
Mars Rover view of volcanic perturbations.
Hoping the patch crew won't overlook this one.

As bad as this looks, the experience of riding on it is even worse.



Thursday, November 12, 2015

Szentendre bike path being resurfaced

Men at work -- hopefully.
 I still can't believe it. This morning on my commute from Budapest, I came across a road crew on the bike path in front of the Szentendre Aldi. They said they were just starting work on a complete resurfacing of the path. All 10 kilometers from Szentendre to the northern border of Budapest.

This path -- running along the west shoulder of Route 11 -- is about a quarter century old, one of the oldest existing paths in the Budapest area. It got a crappy patch job five years ago, but has never been resurfaced. I chronicled by hate-hate relationship with it here: its ruts and holes and gaping cracks have busted many spokes and wheels and axles. If I was Wierd Al Jankovic, I'd write an adaptation of Johnny Cash's "San Quentin". The first line: "Szentendre Bike Path, I hate every inch of YOU!!"

But nevermind, a three-guy road crew from Magyar Közút Zrt. was working on a small section of the path near Aldi, and they claimed to be doing a complete resurfacing of the path from start to finish. I think they said it'd be finished in a month's time. I'll keep posting on the progress.

Thursday, October 8, 2015

Car-free Chain Bridge!!

The way it outta be. Image stolen from here.
If you're for a calmer, quieter less congested city centre, you should come join a demonstration this Sunday afternoon for a car-free Chain Bridge.

The Chain Bridge will soon be renovated, and the Hungarian Cyclists Club sees this as an opportunity to restore its original purpose as a quick, convenient link between central Pest and the Buda Castle.

In its current state, the Chain Bridge is clogged with traffic jams for large parts of every weekday, and on busy weekends, as well. This is because most of the daily users -- 57 percent, according to a city study -- cross by car, the least space-efficient mode of transport, with an average of just 1.2 passengers per vehicle. Meanwhile, 37 percent go by bus (capacity around 80), but they don't get any reward for making a more space-efficient, environmentally friendly choice. They're stuck in the same, creeping traffic jams as the cars.

Bicyclists comprise about 6 percent of daily bridge traffic. And although the bike may be the fastest way to cross the Chain Bridge, it's not a pleasant way to go because you're either squeezed between cars and the bridge railing, or you're maneuvering amongst pedestrians on the sidewalks, where many regard you as a nuisance.

If the bridge was wider, buses could have priority lanes, but it isn't. A common-sense solution is to kick out the cars, and give it back to people. In this way it could be more like the Charles Bridge in Prague -- part and parcel with its eye-catching, historic surroundings, and free of noise and traffic fumes from cars.

The Cyclists Club proposes to start next summer, after school's out, by conducting a temporary trial in which buses would be given top priority in traffic. Without car congestion, bus departures could be more frequent, and the service would be much faster and more reliable. Top speed on the bridge would be held at 30 kph in order that cyclists can share the roadway safely and harmoniously. And pedestrians will have the sidewalks to themselves -- as they should. Last but not least, the Chain Bridge will once again be a feasible route for emergency vehicles.

Many will wonder where all the car drivers will go. But as with the pedestrianisation of Vaci utca and Raday utca, or the traffic reductions on the north-south axis from Ferenciek tere to Szabadsag ter -- people will find alternatives. Either a different route or a different vehicle choice.

If you support this vision, you can sign the Cyclists Club's online petition here. If you'd like to join a cycling demonstration, here are the coordinates:
When: Sunday, October 11. Gathering starts at 2:30 p.m., parade departs at 3 p.m.
Where: Széchenyi tér in the parking area in front of the Hungarian Academy of Science (MTA)
Parade route: Széchényi tér - Chain Bridge - tunnel - U-turn at Attila út - tunnel - Chain Bridge - Széchényi tér. Repeat route once, then return to Hungarian Academy of Science.

Demonstration announcement in Hungarian.

After the demonstration, there will be a public forum on the topic.

Tuesday, October 6, 2015

Bringing Bike Sharing to the 'Burbs?

Peter Dalos, operations manager of the Bubi system, presents at a spring, 2015 public hearing on bike-sharing in Szentendre.
At the Regional Environmental Center, we've just completed a feasibility study on bringing bike-sharing to Szentendre. The result: there's strong popular support for a scheme, and the optimal option would be an e-bike, or pedelec, system with 11 docking points scattered about town.

The nitty gritty of the study, funded by the CIVITAS Initiative, is summed up here.

But I also had some thoughts about it. On the positive side, we had outstanding involvement from City Hall: four or five staff members (including finance, infrastructure and communications experts) attended all of our meetings, and one event was attended by Szentendre's mayor. We also had the involvement of BKK, because one of our original ideas was that Szentendre's system could be an extension of the Bubi system in Budapest. It was one of eight alternatives that we explored.

As you can see in the study, the public was very supportive, with 76.1 percent of survey respondents fully or strongly in favour of introducing bike-sharing in Szentendre, and nearly half saying they would use the service at least occasionally.

Szentendre residents at the spring, 2015 public hearing raised several questions about the proposed scheme.
Despite the positives, it's an open question whether City Hall will take the next step and invest in bike sharing. One thing we learned during the study is that Szentendre, despite its beautiful historic centre and prime location on the riverbank just north of the capital city, is quite cash poor. Cities in Hungary rely on an industrial tax for most of their revenue and Szentendre is more of a residential, bedroom community than a place for business (the wealth of ice-cream shops notwithstanding). So there's considerable reluctance to make investments in anything viewed as non-essential.

There are ways to solve this. There are funding programmes that could help with the investment and there are opportunities for corporate sponsorship which could cover at least part of the operational costs. We even learned of a potential scheme organised by a passenger boat service that would implement bike sharing in riverside communities as a service for their customers.

Beyond that, there's the possibility to go with a low-tech, less expensive version of bike sharing. Although an e-bike system with automated docking stations is attractive, especially given Szentendre's hilly surroundings, the city could implement bike-sharing with standard bikes that could be rented out from a space at the city's HEV stop. The investment would be quite small -- just the bikes, a chip-card reader and a rudimentary shop. You would need staff to run it, as well. But this would be a very handy service for tourists coming up to the city by HEV or Volan bus, and in time it could be expanded and adapted to the needs of commuters (the Dutch OV-fiets system, run by the national rail company, is a good model).

In any case, we've handed the study over to City Hall, and the ball's in their court. There's evident will at City Hall to make Szentendre more bike and pedestrian friendly. It took some tentative steps in that direction this summer, and in our study we've argued that bike-sharing is a powerful tool to promote cycling -- not just on shared bikes, but on any bikes. We're hoping City Hall takes heart.

Thursday, July 2, 2015

Bike Sharing Boosts Property Value

As reported by several outlets (including here and here) the Bubi bike share system has recently been expanded  by 22 new docking stations, bringing the total number of locations to more than 90.

Most of this  expansion was thanks to a contract penalty that BKK enforced against the technical supplier led by ICT company T-Systems Hungary: Due to the delayed rollout of Bubi in spring of last year, the T-Systems consortia had to compensate BKK with HUF 180 million (EUR 589,000).  Rather than paying cash, the providers agreed with BKK to add the new docking stations instead.

But that doesn't account for 100 percent of the expansion. One of the new stations, specifically the one at Corvin Sétány housing and shopping development, was financed by the property's owner. As such, it becomes the first Bubi docking station to be paid for with private money.

This represents a new possibility for system expansion, and a new opportunity for business people interested in the cyclist market. Bubi will install a docking station on your property for a fee, and will take care of its operation and maintenance thereafter. A large station such as the one at Corvin Sétány, with spaces for 30 bikes, along with a rental terminal capable of selling tickets with a chip card reader, is yours for HUF 6.83 million (EUR 21,700). After signing on the dotted line,  the station will be installed in seven to eight months.

Why would someone shell out for such a price? According to János Berki, who headed the Corvin Corvin Sétány project for Futureal, a key consideration for the whole Corvin project was sustainability, with an accent on people and livability. This naturally included cycling facilities, including ample bike racks and changing rooms and showers for office spaces.

Berki didn't mention the docking station's impact on property value, but this may well have been an ulterior motive. According to new research, proximity to public bike sharing stations postively impacts on residential property value. The study, focusing on Montreal, Quebec, showed that for every single bike-share station located in a neighborhood,
"... $700 in property value is added to surrounding houses. Considering that, in Montreal, homes in a bike-sharing friendly neighborhood are, on average, within range of just over 12 stations, the value grows by almost $9,000; that's a 2.7 percent increase in sale value solely by virtue of living near a bike-sharing system."
This makes sense to me. Public bikes not only make a neighbourhood more accessible to more people, they contribute to its appeal as a fashionable, modern quarter.

Meanwhile in Dopeville ... the blog kerekagy recently reported on a "Facebook protest" among regulars of the Matyas Pince, a restaurant at Marcius 5 ter that specialises in traditional Hungarian fare. A Bubi docking station was placed in front of the eatery's entrance, provoking complaints about how it detracted from the historic elegance of the place. Realising that the Matyas Pince menu would of course be heavy on pork, this is very much a case of pearls before swine.


Thursday, June 18, 2015

Szentendre Opens "Car-Freer" Riverfront

On the river side of the korzo, a 3-metre-wide pedestrian strip has displaced street parking. Nice move, Szentendre! The other side of the street is still chock-a-block with cars despite the ban on parking.
The Szentendre riverfront strip has been redesigned in a more bike- and pedestrian-friendly way. But those who expected a car-free "korzó" this summer will be disappointed.

The main change affects the strip of cafes and restaurants from Péter Pál utca to Lázár cár tér. Here, at least according to the city's communications, 53 on-street parking spaces have been eliminated and in their place is a 3-metre-wide pedestrian lane on one side of the street, and expanded restaurant space on the other side. On the one-way traffic lane in between, they've painted yellow chevron markers indicating that cycling is permissible in both directions. Cycling's been permissible in both directions for some time, but the markings hopefully make this clearer to motorists.
On the cafe side of the strip, road crews painted a dashed line that separates traffic from restaurant space. Some restaurants have already occupied their space fully, right up to the line, with flower pots and seating. But where they haven't, motorists continue to park cars in violation of the new rules. This will need some education and enforcement.
As you can see, the changes are ad hoc and not terribly attractive, but the city didn't have funds for a better solution. City Hall says this is a pilot scheme that will be evaluated after the summer season, and if it's seen as successful, the korzó will be redesigned permanently. If and when there's funding, which is a challenge for the perpetually cash-strapped local government.

North of the cafe strip they've created diagonal on-street parking spots, and they're currently in the last phase of constructing an 80-spot parking lot south of Bükkös Creek -- a five-minute walk from the strip. This more than compensates for the eliminated spots in front of the cafes. In fact, doing the math, there's a net addition of 27 parking spots, although you can bet that motorists will complain.


The changes are positive, but the concept of a car-free korzó remains a dream. It's too bad because I believe this would be a huge boon for tourism and be accepted by the traveling public in short order. Motorists who make the korzó a destination now have ample parking within a few-minute walk and those who use it as a transit route have a perfectly good alternative on Route 11.

But for now, we have to settle for a "car-freer" korzó. Our inside sources say this is part of a step-by-step process that will eventually lead to a completely car-free riverfront. Naturally, time will tell.